Skip to content

Cart

Your cart is empty

WEIGHT & PLACEMENT

Plinth is designed to sit confidently in outdoor spaces without groundworks or permanent fixing. Each object is engineered as a complete, above-ground system, allowing it to be positioned, enjoyed, and relocated without disruption to existing surfaces.


This page outlines surface requirements, weight considerations, and placement guidance to ensure long-term performance and stability.

PLACEMENT PHILOSOPHY

Above-ground by design

Plinth is not installed in the traditional sense. There is no digging, no foundations, and no permanent fixing. Each unit arrives fully assembled and is placed directly onto a suitable surface.

Once positioned, Plinth is filled with water, connected to power, and allowed to run.

Nothing is hidden underground. Nothing is permanently altered.

SUITABLE SURFACES

Plinth is a permanent outdoor object and should be treated as such when considering placement.
Weights listed below include:

  • The Plinth unit
  • Integrated filtration system
  • Fountain component
  • Water at the normal operating level
    Note: Final weights may vary slightly depending on configuration and water level.

DECKING GUIDANCE

Plinth can be placed on decking only if the structure is reinforced and load-bearing.

The combined weight of the unit and water is significant, and standard residential decking may not be sufficient without reinforcement.
We recommend:

  • Structural joists beneath the placement area
  • Load is distributed across multiple joists
  • Confirmation from a builder or structural professional if in doubt

Plinth should never be placed on floating, unsupported, or cosmetic decking.

Approximate weights by size

FILLED, IN USE
  • Linear 120 — approx. 350 kg
  • Linear 180 — approx. 650 kg
  • Linear 240 — approx. 900 kg

POSITIONING & CLEARANCE

Plinth should be positioned with enough clearance to allow:

  • Comfortable viewing from all sides
  • Easy access for occasional maintenance
  • Free airflow around the object

We recommend leaving a small perimeter gap between Plinth and surrounding walls, planting, or structures.
Plinth is designed to be viewed as an object, not hidden or built in.

MOVING & REPOSITIONING

Once filled, Plinth should not be moved.

If repositioning is required, the unit must be drained before being lifted or relocated. Due to weight, moving Plinth should always be carried out by multiple people or professional handlers.

FINAL NOTE

Plinth is engineered to sit calmly and permanently in its environment. Correct placement ensures:

  • Structural safety
  • Long-term performance
  • Visual balance
  • Minimal maintenance

If you have questions about your space before ordering, we’re always happy to advise.

Designed in the UK. Manufactured in the UK. Tested before delivery.